The Pool Deck at Marquis, Rebuilt by the Hotel Below It

  • The building is Marquis Residences at 1100 Biscayne Boulevard in Miami, Florida, in Park West, Downtown, across the boulevard from Museum Park.

  • It is a 67 storey glass tower completed in 2009, about 699 feet tall, holding 292 residences above a hotel and parking podium, with residences beginning on the 15th floor.

  • The architect is Arquitectonica of Miami, and the tower is formed of three intersecting parallelograms sheathed in glass.

  • The site is a net lot of 48,607 square feet, and the total area of the building is recorded by its architect at 1,028,698 square feet.

  • The pool deck in these photographs is the Sky Pool Deck, recorded at 16,000 square feet, with a sunrise infinity edge pool facing the bay and a sunset lagoon style pool, beside an 8,000 square foot spa and fitness centre.

  • The developer who built the tower was Leviev Boymelgreen Marquis Developers, the partnership of Shaya Boymelgreen and Lev Leviev, and the project was expected to cost about 276 million dollars when the city approved it in 2005.

  • The city approved the project on January 27, 2005 by Major Use Special Permit under the designation SD-6 in the Southeast Overtown and Park West Overlay District, with a future land use of Residential High Density.

  • The owners in January 2016 are divided. The residences are owned individually under the Marquis Condominium Association, and the lower 15 floors, including the hotel, the spa, the parking garage and the 14 townhouses around the pool, are owned by an affiliate of CGI Merchant Group, which acquired that portion from Africa Israel USA at a price reported at 37.5 million dollars.

  • No artist is attached to the building or to the pool deck, and the work in these photographs was commissioned by CGI Merchant Group as the hotel owner.

  • The hotel inside the tower is the Casa Moderna, previously operated as Tempo, with 56 rooms, and it is being rebuilt and expanded to 129 rooms for a rebrand that had not yet been announced when these photographs were taken.

  • The photographs are by Nadia Bouzid and were published on January 19, 2016. One shows the pool deck under work and one shows the residential lobby.

Marquis Condo Pool Update
Marquis Condominium Lobby || Photo by NB

Marquis Condominium Lobby || Photo by NB


The title of this post needs one correction before anything else in it can be understood, and the correction is a matter of dates. Marquis was completed in 2009, and the people who own its residences had been living in it for seven years when these photographs were taken in January 2016. Nothing about the tower was under construction. What was under construction was one shared floor of it, the pool deck, and the work was being done by an owner most readers of a condominium post would not think to ask about, the owner of the hotel in the lower 15 floors of the same building.

That arrangement is the building, and it is common enough in the Miami towers of the first boom that it deserves to be stated as a rule rather than discovered as a surprise. A tower of this kind is not one property. The residences are individual properties, bought and sold one at a time and governed by an association of their owners. The hotel, the spa, the parking and the retail are a second property, held by one owner, bought and sold in a single transaction, and run for guests who stay by the night. The two properties share a structure, an entrance sequence, a garage and an amenity deck, and they share almost nothing else. Their owners want different things from the same slab of concrete, on different timetables, for different returns.

Africa Israel USA sold that second property to CGI Merchant Group, and the association told its own residents what the new owner intended to do, in a notice that was reproduced in full in January 2014. CGI would transform and rebrand the hotel with a five star hotelier still to be announced. It would convert the 14 townhouses that line the pool deck into hotel suites. It would make major improvements to the pool deck and to the gym, add a restaurant and event space, and build a new hotel entrance on Biscayne Boulevard. The association welcomed the work in that notice and called the improvements long overdue, and it also recorded the term it had negotiated in return for its support, a seat for a condominium board member at the master level of the building, so that the residence owners would have a voice in decisions taken by the owner below them. That single sentence in a form notice is the most honest description of life in a split tower that this archive holds.

The photographs show what that bargain looks like in practice. A pool deck recorded at 16,000 square feet, holding a sunrise pool facing the bay and a sunset pool on the other side, is an amenity a buyer of a residence at Marquis paid for in the purchase price and pays for again in monthly assessments. While it is stripped and rebuilt, the residents keep paying and stop swimming. The value of the finished deck collects in two places at once, in the daily rate of 129 hotel rooms that can be sold against a finished terrace across from two museums, and in the resale value of the residences above it, and those two values do not belong to the same people. A buyer reading a sales gallery for a residence in a building with a hotel inside it should therefore ask a question the gallery will not raise, which is who owns the amenity floor, what that owner has announced, and what the association negotiated before the work began. Unit 1702 at Marquis and Unit 4202 at Marquis show the individual homes that sit on top of this arrangement, and they read differently once the ownership of the deck below them is understood.

The setting explains why a hotel owner would spend this money on this address in 2016, and why the timing is not an accident. Marquis was approved in 2005 facing a park that the approval documents still called Bicentennial Park, on a boulevard of first boom towers that included 900 Biscayne and Ten Museum Park, in a district the city recorded as Park West. By January 2016 the park had become Museum Park in fact as well as in name. PAMM had opened on its edge in 2013, the Frost Museum of Science was under construction beside it, and the Adrienne Arsht Center stood a short walk south. Behind the tower, to the west, the parcels of Miami Worldcenter were being assembled into the largest development site in Downtown, a project this site set out three months later in the Miami Worldcenter master plan. The ground the tower faces is recorded in this archive in Museum Park, and it is the reason the address could support a hotel brand making its first entry into the United States. A residence owner bought a view of a park in 2009. By 2016 that view contained two museums, and the hotel below had a reason to rebuild its terrace that it had not had when the building opened.

None of this makes the work in the photograph a problem, and the association's own notice welcomed it. It makes the work a decision, taken by one owner, with consequences priced into another owner's home, under an agreement most buyers never read. That is the kind of fact a construction update should carry. A stripped pool deck in an occupied tower is not a progress report on a building. It is evidence of who controls the parts of a building that everyone shares, and of what that control is worth when the neighbourhood around the building changes.

Retrospective note, written from the present and kept apart from the 2016 text above: the hotel conversion photographed here finished six months later, when ME Miami opened on July 13, 2016 with 129 rooms as the first ME by Meliá property in the United States, owned by CGI 1100 Biscayne Management, LLC and managed by Meliá Hotels International, with STK Miami as its restaurant. Two months after that opening, in September 2016, the Marquis Condominium Association filed suit in Miami-Dade Circuit Court against Shaya Boymelgreen, Lev Leviev, the general contractor KM Plaza and subcontractors, alleging construction defects in the roof, structural components, post tension cable assemblies, plumbing and fire and life safety systems, and seeking unspecified damages. Those allegations were reported as allegations and no finding is stated here. The open questions recorded in this audit, the cost of the pool work, the contractor and designer of the conversion, the acquisition year of the hotel portion and the current Miami 21 transect label, remain open.